欧美xxxxx高潮喷水麻豆-欧美xxxxx精-欧美xxxx黑人又粗又长精品-欧美xxxx色视频在线观看-欧美xxxx性bbbbb喷水-欧美xxxx做受

7*24Hours for you

15967710202/0577-65336533

company newsCurrent Pocation:homecompany news

What are the requirements of polyurethane foaming machine for polyurethane base

As polyurethane contains strong polar carbamate groups, it can be divided into two types according to its molecular structure: linear type and body type. Due to the different cross-linking density, the structure can be hard, soft or between the two properties, with high strength, high wear resistance and solvent resistance. So what are the basic requirements of polyurethane foaming machine for polyurethane?

1. All pipe fittings, sanitary equipment, floor drain or water outlet must be installed firmly, with tight joints and round end, without any loose phenomenon.

2. Before construction, remove the protrusions, mortar bumps and other foreign matters on the surface of the base layer with spade knife and broom, and thoroughly clean the dirt and sundries. For Yin and Yang Angle, pipe root, floor drain and drain mouth and other parts should be carefully cleaned, such as found oil, rust, to use wire brush


3. The waterproof base of polyurethane shall be wiped with 1:3 cement mortar to make 1/50 flood slope according to the design requirements, and its surface shall be smoothed and compressed, and uneven, loose, sand-removing and other defects shall not be allowed. Drains or floor drains should be lower than the entire waterproof layer, in order to remove water. The pipe position with casing should be more than 20mm above the base surface. The Angle of Yin and Yang should be made into a small round corner with a radius of 10mm, so as to facilitate the coating construction.

4. The construction, in construction of traditional polyurethane waterproof coating, waterproof base should be basic in dry state, it is advisable to moisture content is less than 9%, the simple determination method is the area of 1 ㎡, thickness of 1.5 ~ 2.0 mm rubber cover on the base, place 2 ~ 3 hours, such as the coverage of the surface of the base without the watermark, close to the primary side rubber sheet and no condensation watermark, according to the experience shows that the moisture content is less than 9%, conform to the requirements of the construction.


主站蜘蛛池模板: 99在线观看视频免费精品9 | 国产在线拍揄自揄 | 少妇无套内谢久久久久 | 日韩精品无码免费专区午夜不卡 | 亚洲成av人片在线观高清 | 91精品在线播放视频大全在线观看 | 国产成年码av片在线观看 | 三级黄色网址 | 国产在线拍揄自揄视精品不卡 | 国产一区二区免费在线观看 | 91人妻成人精品一区二区 | 91精品国产品香蕉在线 | 三级高清久久影视 | 91麻豆视频| 欧美一区二区三区在线观看 | 欧美日韩三级电影在线观看 | 亚洲av无码国产精品麻豆天美 | 91精品人妻少妇无码影院 | 人妻精品久久久久 | 国产精品日韩综合图片 | 国产无遮挡18禁网站免费 | 午夜视频网址 | av免费在线观看的网址 | 国产高清一区 | 国产福利片无码区在线观看 | 国产成人久久精品二区三区 | 日本高清专区一区二无线 | 国产老熟女精品一区免费观看全集 | 国产成人v一区二区毛片 | 亚洲av福利天堂在线观看 | 国产内射老熟女aaaa∵ | 超碰艹人人在线观看 | 在线观看视频中文字幕三区 | 人人超人人超碰超国产 | 国产精品18久久久久久妖精 | 午夜亚洲av永久无码精品 | 在线观看毛片黄片免费 | 91精品福利在线观看 | 一区二区三区免费观看 | 久久99 | 亚洲av无码乱码在线观看性色 |